What happens between signing the order and installation day

Un tamplar care monteaza un corp de pal. Arata procesul de fabricare al mobilei la coomanda.

Published: 23 April 2025 · Reading time: ~6 minutes · Author: The Braseco Team

For the client, made-to-measure furniture has two visible moments: the day they sign and the day the fitters arrive. Between them is a period when, apparently, nothing happens.

That is when everything happens. And each stage has its own way of spoiling the result.

Between the drawing and the installation there are several stages where a millimetre can be lost. They add up.

1. Measuring on site

The room gets measured, but not only for width and height. What also gets checked: whether the walls are square, whether the floor drops from one end to the other, where the sockets and switches are, where the pipes run, how the doors and windows open.

A wall shown on the plan as 3,000 millimetres can measure something else at floor level than at ceiling level. If that difference does not reach the drawing, it reaches installation day instead, as a gap that visibly widens as it goes up.

2. Design

The measurements become a production drawing: every unit, every panel, every hole. This is where thicknesses are settled, along with grain direction on the fronts, where each joint falls, which hardware goes in and therefore where its holes are drilled.

The room’s deviations get resolved here too. A wall that is out of square does not get straightened; it gets compensated, usually with a scribe fillet at the end, designed in from the start so it does not look like an afterthought.

3. Cutting

Boards are cut to the dimensions in the drawing. It is the stage with the least tolerance: an error here is not corrected later, the panel is cut again.

With directional materials — veneer, wood-effect decors — the cutting plan also accounts for grain direction, so that adjacent fronts continue into one another. A panel cut to the right size but turned the wrong way shows up immediately on a large front.

4. Edge banding

The cut edge of a board is its vulnerable part: that is where moisture gets in. The edge band closes it, and how well it is applied decides how long it holds.

You check it by touch, not by eye. A well-applied edge has no perceptible step as your finger crosses it and leaves no visible line of adhesive. In a damp area — under the sink, next to the dishwasher — poor edge banding is the first thing to fail.

5. Drilling and preparation

Every hinge, every runner, every dowel needs a hole in an exact position. Whether the doors line up, and whether the gaps between fronts stay equal along the whole run, depends on the precision of this stage.

This is where the difference between plain and busy furniture shows most clearly: across a run of ten identical fronts, a small deviation repeated at every joint becomes visible by the end.

6. Installation

Units are positioned, aligned to each other, fixed to the wall, and the fronts are adjusted. The adjustment takes the longest and is invisible in the final photograph: a hinge is set on three axes until the gap is equal top and bottom.

This is also when the room reveals what it had been hiding: a pipe that was not on the plan, a socket the electrician moved, a floor that rises towards the wall.

Why it takes time

Made-to-measure furniture is not slower because the work is slow, but because nothing exists before the order. No unit is taken off a shelf and delivered; boards are cut for your room, holes are drilled for the hardware you chose, and it is installed in your space, with its particular deviations.

The difference from a catalogue piece is not in the materials, which can be identical. It is that every project is measured, drawn and adjusted once, for one place.

SHOPPING BAG 0
×

Complete your order or continue shopping